Change Operation/Phase Data

Use

You can make changes to the operation/phase data in the operation overview in both Create and Change modes.

Procedure

  1. Choose Operations . You see an overview of the activities.

  2. Depending on which data you want to change, select the operations and/or phases to be processed and then choose the desired processing type.

    If you want to:

    … choose

    Maintain general data

    Maintain standard values

    Maintain user data

    Start of the navigation path Operation Next navigation step Operation Details End of the navigation path and then the tab page of the same name.

    Maintain secondary resources

    Start of the navigation path Operation Next navigation step Secondary Resources End of the navigation path

    Maintain relationships

    Start of the navigation path Operation Next navigation step Relationships End of the navigation path

    Maintain material assignments

    Start of the navigation path Operation Next navigation step Material Assignments End of the navigation path

    Maintain process instructions

    Process Instructions (for phases only).

    Valuate process instruction characteristics

    Process Instructions (for phases only), select the process instruction characteristics and then choose Start of the navigation path Process Instructions Next navigation step PI Characteristic End of the navigation path or PI Assistant .

To make changes to the material list or the material quantity calculation , you can access the relevant detail screens from here (branch to the material list via Materials and from there to the material quantity calculation via ).