Operation Overview

This screen contains the operations and phases the system has copied from the master recipe and scheduled for the process order. The following information is provided:

  • The operation number (This number determines the sequence in which the operations are processed.)

  • The phase number of existing phases

  • The number of the superior operation for each phase

  • The resource that is to be used for carrying out the operation

  • The control key . It determines how the operation/phase is to be treated (for example, whether the phase must be reported, whether it can be printed, etc.).

  • The standard text key of the operation/phase if it has been defined for the operation description

  • The long text indicator which specifies whether a long text exists

  • A short description of the operation/phase

If you choose menu options Start of the navigation path Goto Next navigation step 2-line operation overview End of the navigation path to access the operation overview, the following additional information is displayed:

  • The order start and finish dates

  • The current status of the operation or phase (for example, whether the operation has been created or is already released)

  • Whether material components are assigned to the operation/phase

  • Whether at least one secondary resource is assigned to the operation/phase