Operation OverviewThis screen contains the operations and phases the system has copied from the master recipe and scheduled for the process order. The following information is provided:
The operation number (This number determines the sequence in which the operations are processed.)
The phase number of existing phases
The number of the superior operation for each phase
The resource that is to be used for carrying out the operation
The control key . It determines how the operation/phase is to be treated (for example, whether the phase must be reported, whether it can be printed, etc.).
The standard text key of the operation/phase if it has been defined for the operation description
The long text indicator which specifies whether a long text exists
A short description of the operation/phase
If you choose menu options to access the operation overview, the following additional information is displayed:
The order start and finish dates
The current status of the operation or phase (for example, whether the operation has been created or is already released)
Whether material components are assigned to the operation/phase
Whether at least one secondary resource is assigned to the operation/phase