Editing Inspection Results Requests in the PI AssistantYou have created the inspection results request in the master recipe and called the process instruction assistant (PI assistant); see Editing Process Instructions in the PI Assistant .
Check and, if necessary, correct the assignment of operations and phases for which inspection results are to be recorded.
To add an operation or phase:
Choose
Operation
or
Phase
.
To specify the operation or phase number:
Set the corresponding indicator to determine how the operation or phase number is to be assigned.
If you have specified that a fixed value is assigned, enter the value.
To delete an operation or phase:
Select the characteristic and choose
Op./Ph.
Choose
Copy
and save the master recipe.