Canceling of Material Documents in ABAP List-Based PI Sheets

Use

There are two ways in which you can post goods movements from within the PI sheet:

  • With a data request, by reporting a material quantity produced or consumed in a process message

  • When you enter an order confirmation either via a process message or using a function call

If you have posted a goods movement, and you notice that the data posted is incorrect, you can cancel the data from within the PI sheet.

For information about how to access the cancel function, see Canceling Material Documents Within ABAP List-Based PI Sheets .

Features

To carry out the function, you need to proceed in the same way as when you cancel a material document within inventory management; see Entering a Reversal Document with Reference to a Material Document .

Note Note

If the goods movement you want to cancel was triggered using a process message, you will find the number of the material document in the destination-specific message log of the corresponding process message; see Process Message Logs .

End of the note.