Creation of Missing Planning Objects for Reference Products
You can now create the missing planning objects of a new product by copying the planning objects of a reference product using the upload feature for product assignments. The system creates planning objects for all planning levels of the selected key figures. By default, all key figures your administrator preselected for the planning object check in the Settings for Product Lifecycle app are suggested, but you can add or delete key figures as needed. If the same planning level is used in several key figures, it’s only considered once.
Technical Details
| Types |
New |
| Available as of | 2102 |
Additional Details
-
The creation of planning objects is only available in normalized systems.
-
The upload data for a new product can only contain one reference product in addition to the new product.
-
The following characters aren’t allowed in the product ID of the new product: ,’”§%.
-
The maximum number of planning objects that can be uploaded is 500,000.
-
Planning objects can only be created for planning levels where the level 1 attribute is the root attribute.
Effects on System Administration
You can optionally preselect key figures for the planning object check in the Settings for Product Lifecycle app. You can also specify whether you want the system to check if values exist for the selected key figures.