Backward scheduling
Forward scheduling
Material availability date
The material availability date is calculated by subtracting the picking and packaging time from the loading date.
Transportation planning date
The transportation planning date is calculated by subtracting the transportation planning time from the loading date.
If the material availability date or transportation planning date is in the past, the system does not confirm the requirement for the requested delivery date. Instead, the system runs forward scheduling and determines the earliest date for which the requirement can be confirmed. The latest material availability date and transportation planning date are calculated to keep the material availability date as close as possible to the confirmed delivery date, as illustrated in the following figure:

Backward and forward scheduling
If, for example, the transportation planning date is significantly earlier than the material availability date, and it is also in the past, the system performs a new forward calculation. The system sets the earliest date to today and calculates the earliest delivery date for the confirmation. In addition, the latest material availability date is calculated.