Consistency Check on Budget Objects This function enables you to carry out a consistency check on budget objects in a budget structure (BS) that you defined using individual objects.
The system checks if a complete hierarchy of budget objects is guaranteed and if superior objects for all budget objects exist.
Consistency in the BS is guaranteed if:
the superior commitment item of the same funds center is a budget object
or if the same commitment item is defined as a budget object on the level directly above
Note
The BS is consistent if the superior budget object is not more than “1 center level and 0 item levels” or “0 center levels and 1 item level” away.
Enter the required data and choose
.
Choose
.
In the event of an error, the following happens:
In the dialog box
Document lines: Display messages
the system displays a list of all budget objects for which no superior budget objects are defined.