Working With Propose Linking

You use this procedure to maintain the digital thread (cross-reference) linking between the Source and Target nodes. You use the Propose Linking option along with the Load BOM option in the Target panel.

Prerequisites

  • You've created a handover for an EBOM using the Hand Over Engineering Bills of Material (EBOM) app.

    For more information, see Creating a Handover.

  • You've loaded the assemblies in both the Source and Target panels.

Context

The following are the scenarios where the target BOM component may not be generated through planning and there won't be an established link between source and target BOM components:
  • When you import BOMs from other external systems.

  • When you add components (manufacturing consumables) independently in the Target and maintain specific properties.

  • When you load BOM with a different context.

The following procedure showcases how to establish the link between the source and target BOM components:

Procedure

  1. In the Target panel, select the nodes for which the links aren't maintained or you can choose Propose Linking without any selection of the nodes.
    A Link Target Items to Source Items dialog box appears with the Target panel filtered based on the nodes where the links aren't established with the source components in a hierarchy. The dialog box consists of the following:
    • Search and Filter By

      You can use the Search fields to find the BOM components either in the Source or Target panels.

      You can use the Filter By option to view the BOM components in the Target panel based on the proposal strengths.

    • The Source panel displays the details of the selected BOM. The Target panel along with the BOM details displays the following:

      • Link

        You use this button to establish a link between the source and the target components.

      • Highlight Proposal

        You use this button to highlight the potential rows or nodes in the Source for a selected target component that you can use to establish a link between the source and the target. You can also use this button to highlight the nodes in the Source and Target that are linked.

      • Proposal Strength

        Proposal Strength

        Description

        Best

        Indicates that the system has found the only suitable match in the Source to establish the link.

        By default, the link is already established between the Source and the Target.

        Good

        Indicates that the system has found several matches in the Source to establish the link. These matches for linking aren't based only on material but several other attributes. Here the link is established based on the user action.

        You can go ahead and select Accept or Reject the system-suggested proposal for linking from the corresponding row in the Action column.

        Not Linked

        Indicates the node doesn't have any match for establishing a link. You can go ahead and select any potential node in the Source and establish a link using the Link button.

        Linked

        Indicates you have accepted the proposal and the link is established.

      • Action

        The column provides a dropdown box with Accept and Reject options for the rows with Proposal Strength value as Good.

  2. Select the nodes with the Proposal Strength as Good.
  3. Select Accept or Reject the system-suggested proposal for linking from the corresponding row in the Action column.

    If you select Accept, the link is established and the Proposal Strength changes from Good to Linked.

    If you select Reject, the link is broken and the Proposal Strength changes from Good to Not Linked.

  4. For the node with the Proposal Strength as Not Linked, select a potential node from the Source that you find appropriate for establishing a link.
  5. Choose Link.

    A link is established between the source and the target, and the Proposal Strength changes from Not Linked to Linked.

  6. Save the changes.