How to Refer to a Baseline in the Handover Process (Source EBOM)
Prerequisites
-
In order to run the end-to-end scenario, you must have subscribed to both SaaS applications, Product Handover and Configuration Management.
-
You've created baselines for products whose EBOM is being considered for the handover. For more information, see Create a Baseline.
Procedure
-
Load the Hand Over Engineering Bill of Material (EBOM) app and search for an EBOM.
-
Navigate to the worklist page and choose Create Handover.
-
In the Input Handover Details dialog, add the required information in the Source Details section.
-
Switch ON the toggle for Baseline and search for the Baseline ID using the value help in the input field.
The Baseline ID, version, description, controlled object, and status details should be visible. -
Add the other input details for both Source and Target and choose Submit.
Result
The system initiates a handover with the baseline details and navigates to the Handover From Engineering BOM Planner page. You can view the baseline details in the header section of the Source.
In the Source panel, the EBOM is exploded to the nth level of the hierarchy. You can now proceed with the planning of the MBOM.