Hide the Valid From Attribute for Engineering Version Product Structures as a Source

Business Background

With this update, the Hand Over Engineering Bills of Material (EBOM) application provides a clearer handover experience for BOM originating from IPD Product Structure. While IPD Product Structure BOMs can support both version-based and date-based validity, SAP S/4HANA BOMs use date-based validity only. This difference can lead to ambiguity when users interpret validity information during handover activities. The enhancement improves usability by presenting only the Valid From attribute (validity information) that is relevant to the selected BOM, helping users better distinguish between version-based and date-based validity concepts and reducing the likelihood of misinterpretation during engineering-to-manufacturing handovers.

Technical Details

SaaS Application

Product Handover

Type

New

Delivery Landscape

Preview

Action

Recommended

Valid as Of

November 13, 2026

User Interface

Impact

With this upgrade, the Valid From attribute is no longer displayed in the Source section of the header area on the Handover From Engineering BOM Planner page for IPD Product Structure BOMs with version-based validity in the Hand Over Engineering Bills of Material (EBOM) app.
  • When users create a handover for a IPD Product Structure BOM with a version-based validity type, the Valid From attribute is hidden in the Source section of the header area on the Handover From Engineering BOM Planner page. This change helps avoid confusion between product version validity and the date-based validity used in SAP S/4HANA BOMs and IPD Product Structure BOMs.

Necessary Action

Inform your business users of these user interface changes.