You use this process to create bill customers for work done, materials used, and other costs incurred in customer projects.
In the SAP System you process customer projects by means of sales order items assigned to projects. You create a
billing request in a sales order in the component
Sales and Distribution
(SD). This means that the resource-related billing process for customer orders is the same as the process in Sales and Distribution (SD).
You can only use this component if you also use SD because you need a sales order assigned to the project before you can run resource-related billing.
By assigning one or more than one order item to a WBS element specified as a billing element, you connect the sales order in
Sales and Distribution
(SD) with the
Project System
(PS).
The billing element that refers to the sales order item is the highest element in the billing structure. All of the objects subordinate in the hierarchy to the billing element (WBS elements, orders, networks, network elements) belong to this billing structure.
You created an order item (for example, standard order or repair order) that is account assigned to a WBS element in a customer project.
To do this, define the WBS element to be account assigned to the order item on the
Account Assignment
tab page.
You defined a Dynamic Item Processor profile in the order.
To do this, enter a Dynamic Item Processor profile (DIP profile) in the tab strip
Sales B
for the order item.
In the order item, define a material that permits account assignment to a project.
For more information, see Customizing for the
Project System
under Revenues and Earnings→
Integration with SD Documents
→
Assign Sales Orders to Project Account
.
You defined a Dynamic Item Processor profile.
If you maintained the Dynamic Item Processor profile in a way so that the system takes the actual cost totals records as the source for the dynamic items, the system does not display the costs according to material.
The WBS element assigned to the sales order item carries costs.
Go to customizing and use the DIP profile to stipulate which data is to be billed and how the system is to summarize this data for the billing request.
Confirm expenditures (such as work done or materials used) in the sales order.
You have the option of differentiating the confirmed costs according to cost element or accounting indicator as well. For more information, see Accounting Indicator in the Completion Confirmation and Reposting the Accounting Indicator .
Create a billing request.
When you opt to create a billing request, the system works as follows:
a.
Starting with the costs, it determines the expenditure basis items using the DIP profile (see
Prerequisites
above). These items are identified as dynamic items.
b. The system sorts the dynamic items according to the SD order items and determines the price of the billing request using SD Pricing .
To this end, it uses the document category (from the DIP profile) to determine the pricing procedure.
There are two views you can use for processing:
Save the billing request in a document.
The system records the revenues to the project.