Creating/Changing Cost Center Weightings
Prerequisites
You change cost center assignments to adjust the weighting applied.
Weightings are used if positions and organizational units have more than one cost center assignment, during one period of time. This can happen, for example, if two departments share the cost of one position. In these types of situations, weightings identify the percentage of costs to be charged to each cost center.
Procedure
-
On the Change Account Assignment screen, choose the cost center assignment you want to change.
-
Choose .
The Create Cost Distribution dialog box appears.
-
In the Percentage field, enter data as required.
-
Save your entries.
Results
The system saves the change. The new percentage is displayed in the tree structure, provided the proper view option is set.

