Activate Planning Function Type

This activity is to be performed in the client where BW has been activated. To do this, follow the procedure below.

Procedure

  1. In the tool BW client, call up transaction RSA1.
  2. In the window on the left, choose BI Content.
  3. In the same window, choose Object Types.
  4. In the second window, expand the Planning folder.
  5. In the Planning folder, expand the Function Type for Planning (PLST) node.
  6. Choose Select Objects.
  7. A dialog box appears with the list of object names. Select the object /NXI/P1_PLANNING_FT- Performance Management Planning Function Type.
  8. Choose Transfer Selections.

    The information message “Choose one or more source systems” appears.

  9. Choose Confirm.
  10. The system shows the dialog box Select Source Systems.
  11. Select the BW checkbox.
  12. Choose OK/Continue.
  13. The object appears in the window on the right (content activation pane). Ignore any error messages in the collection log.
  14. Choose Install.
  15. Planning function type /NXI/P1_PLANNING_FT is now activated.