HANA Steps
The steps in this section have to be executed in SAP HANA studio.
The HANA steps you have to carry out depend on your individual situation:
-
It is mandatory for a newly installed SAP Profitability and Performance Management 3.0 system to perform the steps from Support Package 01 up to the latest patch level installed in the system.
-
For a Support Package update, make sure to perform the steps mentioned in the Support Packages that were just implemented.
In the sections below, you find the necessary HANA steps for each Support Package.
Steps for SP06 to SP21
No additional HANA Steps for SP06, SP07, SP08, SP09, SP10, SP11, SP12, SP13, SP14, SP15, SP16, SP17, SP18, SP19, SP20 and SP21.
Steps for SP02 to SP04
No additional HANA Steps for SP02, SP03 and SP04
Steps for SP01
- Create NXI Schema in SAP HANA Studio
- Grant Full Authorization to SAP DB Connection User in SAP HANA Studio
- Grant SELECT and EXECUTE Authorizations to _SYS_REPO User in SAP HANA Studio
- Assign System Privileges to SAP DB Connection User (Optional)
- Adjust SAP HANA DB Parameters
- Maintain Schema Mapping for NXI Schema