Maintaining Assignment Between Event Without Field Restrictions and Change Document

Prerequisites

The event that you want to create is defined as a component of an object type.

Procedure

You make the following settings to create an event each time a particular change document is written.

  1. Choose Start of the navigation pathTools Next navigation step Business Workflow Next navigation step Development Next navigation step Definition Tools Next navigation step Results Next navigation step Result Creation Next navigation step Change Documents Next navigation step AccessEnd of the navigation path.

  2. Create a new entry in the first view Change "Results for Change Document": Overview. To do this, choose the function New Entries.

  3. Specify a change document object in the field Chng.doc.obj..

  4. In the field Business Obj. Type, enter the object type whose status change is to be indicated by the event created. Use the F4 input help.

  5. Enter the ID of the event to be created in the field Event. The event must be defined for the specified object type. The name is taken automatically from the object type definition.

  6. Select whether the event is to be created upon change, create, or delete actions.

  7. Save your entries and exit view maintenance.

Result

If you have catered for the creation of an event in the manner described above, you can use this event as a triggering event of a task or workflow in the normal way.

Event container of created event

In addition to other elements, the event container of the created event contains:

  • The reference to the changed object in the element _Evt_Object.

  • The reference to the user logged-on in the element _Evt_Creator.