Pick PartMaterial that you stage for a production order in the required quantity in a fixed storage bin in production or in a dynamic production storage bin.
Using pick parts, you ensure material staging from the warehouse to production, based purely on the production order. You stage the quantity of the material requested in the production order with a direct reference to the production order. You can stage the material in a fixed storage bin in production or in a dynamic storage bin "production order".
For this type of material staging, you can create transfer requirements (TRs) in two different ways:
Create the TR automatically when the production order is released
These transfer requirements are always based on the quantity required in the production order and the production deadlines.
Set the indicator
WM Request
accordingly in the
Production Control Profile
in the Customizing for
Warehouse Management
under
Create the TR for the production order manually .
In both PP and the WMS, you can create transfer requirements for pick parts that are needed in various quantities and at different times for a specific production order. For more information, refer to Creating Transfer Requirements Manually for Material Staging .
Note
The requirement tracking number for pick parts is the production order number. If the production order number consists of more than 10 digits, the system shortens the requirement number right to left.
Confirmation of Batches
For pick parts, you can confirm batches, issued by the WMS for a production order, to the production order:
If you use dynamic production storage bins, confirmation occurs automatically because the system assigns the batches to the production orders.
If you use fixed storage bins for staging pick parts for production, there is no definitive assignment between the production order and the batch found. You use fixed storage bins for several production orders. In this case, specify that you want to implement batch confirmation in the field
Batch Entry
in the material master, view
MRP 2.
Material Staging via Deliveries
As an alternative to transfer requirements, you can also use deliveries to execute the material staging of pick parts. To do this, set the indicator
GI via Delivery
in the Customizing for
Warehouse Management
under
Note
You must enter the
Delivery Type
and the
Goods Recipient
of the delivery in Customizing. We recommend using delivery type
WMPP
in the standard system.
You must enter the
Sales View
in the material master and enter the
General Item Category Group
(for example
WMPP
) in the view
Basic Data 1.
When you confirm the transfer order, the system sets the status of the delivery to Completely processed , depending on the shipping control at movement type level. The system also posts the consumption of the staged components.