Create Detached Order Assembly

Use

You create a detached order assembly if, for example, you have to design, order or assemble certain components, before the design of the whole product is complete. You do not have to decide until later, at which point you want to insert the detached order assembly.

Prerequisites

You have already entered the material, into which you later want to insert the detached order assembly, in a sales order.

Procedure

  1. Choose Start of the navigation path Logistics Next navigation step Production Next navigation step Master data Next navigation step Bills of material Next navigation step Bill of material Next navigation step Order BOM Next navigation step Create. End of the navigation path

  1. Create an order BOM as described in Creating an Order BOM .

If the BOM header material that you entered in the initial screen is not available in the multi-level BOM for the sales order item, you see a detached order assembly.

Result

In the order analysis the detached order assembly is shown on the tab page Detached .

Note Note

A detached assembly is also created if you

End of the note.
  • Delete an item in a bill of material, which is the header for an order BOM

  • Delete a bill of material, that contains an item which is the header for an order BOM