Detailed Planning Requirement/By-Product Generation/Replacement

Use

You use the Detailed Planning Requirement/By-Product Generation/Replacement transaction to perform detailed planning of the requirement, by-product generation and replacement. The system displays the values for requirement and by-product generation from production planning. You can adjust these values or plan additional requirement and by-product generation.

The system displays all the materials defined as replacement materials in the plant in the Control Replacement detail table. If you created a replacement material for a material, the system displays the material to be replaced in the Control Replacement detail table.

Prerequisites

You flag the material as a replacement material by assigning a production version in the Enhancement Material Master transaction.

Activities

Call the Detailed Planning Requirement/By-Product Generation/Replacement transaction under Start of the navigation pathDairy Planning Next navigation step Raw Material PlanningEnd of the navigation path.