Assign Plant for Cross-Plant BOM Explosion

Use

You use the Assign Plant for Cross-Plant BOM Explosion transaction to assign a plant (role: production plant), which is responsible for the production of the dependent requirement, to a manufacturing plant (role: supplying plant). The system use the data in this transaction for cross-plant BOM explosion.

When the system explodes the BOM for a material during production planning in a plant, it is possible that a component material is obtained either fully or partially from another production plant. You define this using a percentage rate. The system uses the properties, which are defined in the transaction Assign Plant for Cross-Plant BOM, to control the requirement creation and also the calculation of the deviating requirement time in this production plant.

Activities

Call the Assign Plant for Cross-Plant BOM Explosion transaction under Start of the navigation pathDairy Planning Next navigation step Master DataEnd of the navigation path.