MRP Live: Included in Planning
You use the options available in this section to further define the scope of the planning run and to determine exactly what you want the system to include in planning.
The following checkboxes are available:
BOM Components
If you leave this checkbox blank, the system only plans the materials that you selected in the Planning Scope
section. If you want to plan the selected materials plus all their components, you must select this checkbox.
Stock Transfer
If you leave this checkbox blank, the system only plans the locations of the plants that you selected in the Planning Scope
section. If you want to plan the selected plants plus their supplying plants, you must select this checkbox.
Note
Authorization Information
MRP Live only plans the component materials or supplying plants if you are authorized to plan the component material or the material in the supplying plant. If you are not authorized, the system only creates dependent requirements or stock transfer requirements and planning file entries.