Run Schedule HeaderThe data basis for the standard analysis run schedule header is the data that are updated in the information structure S025.
Plant
MRP controller
Material
Production version
Production line
Run schedule header
Actual scrap quantity
Planned quantity
Planned scrap quantity
Quantity of goods received