Run Schedule Header

The data basis for the standard analysis run schedule header is the data that are updated in the information structure S025.

Characteristics

  • Plant

  • MRP controller

  • Material

  • Production version

  • Production line

  • Run schedule header

Key Figures

  • Actual scrap quantity

  • Planned quantity

  • Planned scrap quantity

  • Quantity of goods received