Stock/Requirements - Current and - Long-term Planning

The standard analyses stock/requirement - current and long-term planning is based on data that are updated in the information structure S094.

Characteristics

  • Plant

  • MRP

  • MRP type

  • Material

Key Figures

  • ATP quantity

  • Cumulated ATP quantity

  • Issue (MRP)

  • Issue value (MRP)

  • Non available receipts

  • Number of receipts

  • Planning requirement

  • Receipt quantity (MRP)

  • Receipt value (MRP)

  • Requirements

  • Safety stock

  • Stock at receipt

  • Stock quantity (MRP)

  • Stock value (MRP)

  • Total issue quantity

  • Total stock

  • Value of ATP quantity

  • Value of cumulated ATP quantity

  • Value of safety stock

  • Value of stock receipt

  • Value total issue

  • Value total receipt

  • Value total stock