Key Figures for Repetitive Manufacturing (S025/S028)

Key Figures for Run Schedule Header

The following key figures are updated for the run schedule header (information structure S025):

  • Quantity of goods received

    The quantity of goods received is updated when creating the actual data within the scope of the repetitive manufacturing.

  • Actual scrap quantity order item

  • Planned quantity, planned scrap quantity

    Both of these key figures are updated from the run schedule quantity of repetitive manufacturing.

Key Figures for Reporting Point Statistics

The following key figures are updated for the reporting point statistics of the run schedule header (S028):

  • Transaction quantity

  • Scrap quantity transaction

  • Confirmed lot size

  • Confirmed scrap