Key Figures for Flow of QuantitiesIn contrast to the first group, which illustrated the stock placement and removal movement, the flow of quantities between two warehouse points will now be looked at.
Updating the key figures of this group is carried out when a transfer order is either created or confirmed to the creation date of the transfer order.
Number of transfer order items between stock placement type and stock removal type (number of transactions)
Number of items with a zero stock check
Number of transfer order items where the time difference between creating and confirming the transfer orders was calculated (number OCr-OCo)
Number of transfer order items where the time difference between creating the transfer requirement and creating the transfer orders was calculated (number RCr-OCr)
Number of transfer order items where the time difference between the planning date of the transfer requirement and creating the transfer order was calculated (number RP-OCr)
Number of transfer order items where the time difference between the delivery note picking date and creating the transfer orders was calculated (number DP-OCr)
Number of transfer order items with a difference, which was posted back to the source storage bin (number of diff.)
Number of transfer order items, for which "real" differences occurred. Real differences are those which as a result of the difference indicator were not posted to the source storage bin.
Number of transfer order items with a reference to a delivery note
Number of transfer order items with a reference to a reference number
Number of transfer order items with a reference to a material reservation
Number of transfer order items with a reference to a transfer requirement
Number of transfer order items, where the return transfer occurred in the source storage bin.
Moving quantity
Quantity of material transactions between stock removal type and stock placement type.
Quantity difference source storage bin
Quantities of the transfer order items with differences on the source storage bin
Quantities with real differences
Real differences are those that as a result of the difference indicator were not posted back to the source storage bin.
Average moving quantity
Average quantity of the material transaction of a transfer item between stock removal type and stock placement type (is calculated when standard analysis is executed)
Transaction weight
Quantity of the material transactions between stock removal type and stock placement type.
Average transaction weight of the material transaction of a transfer order item between the stock removal type and the stock placement type (calculated when standard analysis is carried out).
Total time between creating and confirming the transfer order
Total time between planning date of the transfer requirement and creating the transfer order
Total time between creating the transfer requirement and creating the transfer order
Total time between the delivery note picking date and creating the transfer order
The following key figures are calculated when the standard analysis is carried out for flow of quantities. They are obtained by dividing the total time by the total items for which this time period was calculated.
Average time which expires between creating and confirming the transfer order
Average time between creating the transfer requirement and the transfer order
Average time, which expires between the transfer requirement-planning date and creating the transfer order
Average time which expires between the delivery note picking date and creating the transfer order