New Setting for Croston Method

You can now set the Croston method algorithm in the Manage Forecast Models app to consider the interval between the last period with demand and the last historical period when smoothing demand intervals by calculating their average length.

Technical Details

Types

New

Available as of 2008

Additional Details

The new option can help the algorithm calculate the average interval correctly, especially when the distance between the last period with demand and the last historical period is significantly different from the average (in other words, when there are many trailing zeros in the time series after the last period with demand).