Settlement of Time-Based Equipment The basis for settlement of time-based equipment is:
the shipping document (acquisition documents, shipping documents, changes of activity type and retirement documents)
the appropriate activity and settlement type (AS type), for example, “in operation”, “available for use”, “downtime”
the commissioning time in days, the factory calendar and the number of days per month in the recipient master record
the Catalog (a type of equipment specifications list) for pricing purposes
Caution
The system checks the following:
whether the equipment type of the equipment (in Customizing) is relevant to stock checks
which recipient master record is used for settlement (3-level hierarchy)
Equipment 4711 has been defined as an equipment item with equipment type 2000 in the equipment master record.
Settings in Customizing for ETM:
, the indicator (
InvM
indicator) has been set for chronological inventory management.
, the indicator (
InvM
indicator) has been set for chronological inventory management.
Settlement type: complete month and remaining calendar days
Days/month: 30 days
Equipment (for example, a crane) is sent to usage site A with a shipping document on Oct. 15
th
. It remains at usage site A for the whole of the settlement period. Settlement takes place on Oct. 31
st
. The
RetireDate/TBE
indicator for time-based equipment is set for usage site A.

Result of settlement on Oct. 31 st: Calendar days determined from Oct. 15 th until Oct. 31 st = 15 days. The retirement date is of no consequence here. The retirement date does not count until an actual retirement (scrapping, sale of equipment and so on) takes place.
The monthly depreciation and interest rate (lower value) is € 3,375.
Condition value: 15/30 * € 3.375 = € 1.687,50
Result of settlement on Nov. 31 st: Calendar days determined from Nov. 1 st until Nov. 12 th (incl. retirement date) = 12 days.
The monthly depreciation and interest rate is the same as above.
Condition value: 12/30 * € 3.375 = € 1,350
The above equipment is sent to usage site B on Nov. 12 th where its activity type is changed several times. It is sent to usage site C on Dec. 20 th and it remains there for the rest of the settlement period.
Usage site B: retirement date (TBE) does not count
Usage site C: Retirement date (TBE) counts

Result of Settlement on Nov. 30 th:
At usage site B:
An order item from 11.12 until 11.19. = 8 days in operation
An order item from 11.20. until 11.25. = 6 days available for use
An order item from 11.26. until 11.30. = 5 days downtime
Result of Settlement on Dec. 31 st:
At usage site B:
An order item from Dec. 1 st to Dec. 20 th = 19 days in operation (without retirement date – see above)
At usage site C:
An order item from Dec. 21 st to Dec. 31 st = 11 days in operation (acquisition date always counts for TBE)
Equipment 4711 has been defined as an equipment item with equipment type 2000 in the equipment master record.
Settings in Customizing for
ETM
:
, the indicator (
InvM
indicator) has been set for chronological inventory management.
Under
, The indicator (
Stck
indicator) has been set as being relevant to stock checks. In other words, if for organizational reasons PBE documents also existed for TBE, these would be taken into account in settlement.
Result of settlement: settlement would take place twice in this case – once using the shipping document as in case study 1 and a second time using the PBE document.
Recommendation
To avoid this, you should block the PBE document against data entry for TBE.