[Optional:] Importing Usage Data from a Production System
The Usage and Procedure Logging (UPL) feature measures the productive usage of specific development objects in the production system.
Prerequisites
The Usage and Procedure Logging (UPL) data can only be retrieved from a Solution Manager 7.1 SP14 or a higher system through a configured RFC connection.
Context
You can import the usage data that relates to your customer object(s) and is provided by the UPL to the Custom Code Migration Worklist. This will help you to set priorities for adopting hits. To do this, you have to connect the Solution Manager system with the evaluation system through an RFC destination. The usage data is then assigned to the corresponding customer objects and displayed in the worklist.
Procedure
In the evaluation system, run transaction SYCM.
The Display customer objects affected by simplifications screen is opened.
In the SAP System ID field, choose F4 to select the analyzed SAP Business Suite system from the value help.
In the Custom Code Migration Worklist, choose AnalysisConfigure UPL Data Access from the menu bar.
The UPL data transfer configuration dialog box is opened.
Choose one of the following options to import the usage data:
Transfer UPL records for chosen system for all datasets of the chosen target system
Transfer UPL records for selection only for the selected datasets from the previously entered SAP System ID
The UPL Data Configuration dialog is opened.
Define the following entries:
Managed System: Name of the productive system where the UPL data was measured.
RFC Destination Definition of the connection to the Solution Manager system
Date Interval: Time interval during which the executions should be counted
Check the consistency of the input by choosing Check.
Get the usage data from the Solution Manager system by choosing Transfer.
The data transfer job starts. Continue with the subsequent steps when the job has finished.
You can check this in the job overview (transaction SM37). When the transfer is finished, a dialog is opened for you to schedule the transfer job.
Choose the relevant button to schedule the transfer job.
To start the transfer, choose Save.
A job is started that determines the number of executions from the configured destination.
In the Message Area of the UPL Data Configuration dialog, the result of the import is displayed.
[Optional: ] Check the status of the job by choosing Show Job.
Choose Refresh Excecutions when the import job has finished.
Results
The Executions column of the worklist displays the number of executions of the corresponding customer objects during the specified time interval.
If no data is available, N/A is displayed for the corresponding entry.