245
PUBLIC
© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP S/4HANA Supply Chain
Optimize your stock and inventory turnover and
material flow
Track inventory situation cross entities
and over-time to react as needed
PRODUCTION PLANNINGSolution Capabilities:
E2E Business Process:
GOODS ISSUE GOODS RECEIPT BAS IC WAREHOUSE MGMT. BASIC SHIPPING MATERIAL REQUIREMENT S PLANNING BASIC ORDER PROMISING / ATPInnovation & Highlights:
Visualize & simulate MRP
options with fast insight to action
INVENTORY & BASIC WAREHOUSE MGMTOptimize the inventory and
material flows with analytical
apps, to include:
•
Inventory turnover
analysis
•
Flow analysis
Use simplified GI postings
•
Transfer and scrapping
For complex movements
use
MIGO with One Look
Leverage
simplified data
model
incl. 40 digit mat-no.
For real-time, high-volume
processing you can post
with finest granularity to
leverage sensor data.
Benefit from locking
elimination and material
ledger valuation.
Use simplified new apps for
•
GR from PO
•
Initial entry
Leverage embedded EWMto perform standardized
inbound & outbound
processing with
internal
movements
and
physical
inventory & reporting
.
Leverage
one system
(master data, customizing &
UX) for reduced data-
redundancy, lean processes
with fewer business docs
and overall
simplification
Simplified apps for
shipping
specialist:
Ability to search for
outbound deliveries
and
returns deliveries
via
object pages, including
details about header and
item data.
Optimize material flow forexternal and internal
requirements (MRP)
with
system-generated
solution
proposals.
Manage and track change
requests
for orders.
One single MRP
if all
downstream materials are
advanced planning-
relevant.
Available to promise: newATP algorithm based
on
HANA embedded in mass
component check in
production.
Improve percentage
on-
time delivery
.
Leverage
just-in-time
scenarios for inbound and
outbound.




