Edit Last Run Date

Describes how to edit the last run date of a download connector.

Context

Certain download connectors look at the last run date and pull data created after that date. If needed, you can edit the last run date to bypass the date and pull older data.

For example, a worker download is configured to automatically download worker records once per week. The download pulls all workers created in the week by looking at the previous run date. To troubleshoot a download issue, you change the last run date to an older date, to download data as of that date.

Procedure

  1. On the top-right side of the connector Integration page, click in the Actions list, and then choose Edit Last Run Date.

    The Edit Last Run Date dialog box opens.

  2. In the Last Run Date field, enter the new date in the existing date format.
  3. Choose Update.

    The date changes to the new value.