Determination of Basic Load (Report RCCYLOAD)When you use the capacity availability check for the first time or when you only use the availability check or the planning table irregularly for orders relevant to production, the basic load is not current; that is, it does not contain all the capacity requirements that are relevant to the capacity availability check. In this case, you should specify the basic load before the capacity availability check using the report RCCYLOAD.
Choose
The
ABAP Editor
:
Initial screen
appears
Enter RCCYLOAD as the program, and choose
Note
You can call up the report for Determination of basic load in
Plant Maintenance
and in
Customer Service
by choosing:
The
Initialization of Basic Load
screen appears.
Select the capacity requirements from the screen sections
Order-related data
and
Operation and requirements-related data
that you want to incorporate into or remove from the basic load.
The selection criteria are linked by a logical AND.
Set the following indicators in the screen section for operation and requirements-related data as required:
If you want to: |
Set the indicator: |
Select
|
|
Select
|
|
Choose in the
Control
screen section what the system should do:
If the system should: |
Choose: |
Display the number of selected capacity requirements |
|
|
|
|
|
Choose