Passing on Status Information

You can pass on the following project IMG status information, i.e. pass the status values of a node to all its lower level structure nodes:

  • Status

  • Plan data

  • Project team members

  • Keywords

You can also delete a status value for all subnodes of a node.

Prerequisites

Status information is maintained for a structure node in the project IMG.

Procedure

  1. Display your Project IMG.

  2. Enter the required status information.

  3. Choose Start of the navigation pathActivity data  Next navigation step  Pass onEnd of the navigation path .

  4. Choose the values to be passed on.

  5. To delete a status value in all subnodes, choose the radio button for the value in the Delete column.

  6. Choose Continue .

Result

The status values are passed on to all lower-level structure nodes.