Check-Out Transportation Units (without Yard Order)
You use this function to check-out the transportation units that exist on the yard without a yard order. This functionality is intended for processes like scrapping a transportation unit. As there is no yard order involved, there is no communication to an external system. The report requires that all transportation units to be processed are located at a checkpoint.
Activities
-
From the user interface, go to .
The Check-Out Transportation Units screen appears.
-
Enter the following information on the selection screen.
-
Yard Number
-
Checkpoint – This is the departure checkpoint of a transportation unit in a yard.
-
Transportation Unit – You can enter any number of transportation units that you want to check-out.
-
Number of TUs per LUW – This is the number of TUs that the system processes per LUW. For better performance, enter maximum number here. However, if even one TU is not successfully executed in an LUW, the system does not check-out any of the TUs.
-
Test Mode or Execution Mode
-
-
Execute the report
The system displays a log of checked-out TUs.

