DIFFSU

Name

DIFFSU

Overtake and Undertake Amount for Each Settlement Unit

Class

CL_ISU_EDM_SETTLSTEP_0009

Additional information

The difference between the energy quantity actually consumed and the energy quantity settled (overtake and undertake amount) is determined for each settlement unit.

The settled energy quantity is generally an input parameter of the settlement procedure. The quantity of energy actually consumed must be determined from the actual meter reading results (load shapes, usage factors) before settlement step DIFFSU is executed.

Parameter number/type

01 - Importing

Parameter description

PrLoadSup – Total Load Shape in the Settlement Unit (current)

Parameter number/type

02 – Importing

Parameter description

PrLoadSupSettl - Settled Total Load Shape in the Settlement Unit

Parameter number/type

01 -Exporting

Parameter description

PrDiffLoadSup – Overtake and Undertake Amount in Settlement Unit