Time Period for a Scheduled Import Job
You can schedule a job to import data, and the scheduled date of the job must be within 30 days.
When you set 30 days time period for running a scheduled job, it helps
in storage optimization by removing unwanted, outdated, and orphaned files.
What's Changed
In the current version, the date of running a job for importing files must be within 30 days of scheduling it.
In previous versions, the scheduled date for running a job to import files didn't have a specified time period.
Technical Details
Reference Number |
LRN-70104 |
Type |
New |
Configuration Type |
Universal |
Availability |
Full Availability |
Module |
Learning |
Feature |
Data Retention Management |
Major or Minor |
Major |
Link to Demo |
|
Software Version |
2H 2020 |
Valid as Of |
2020-11-20 |
Latest Document Revision |
2020-11-06 |