Updating Other PricesUpdating the tax-based and commercial prices 1, 2, and 3
Updating the other planned prices 1, 2, and 3
Choose
The screen
Price Update: Mark Standard Price
appears.
Choose
Other prices.
The screen
Price Update: Release Other Prices
appears.
Enter the data required to limit the selection to those cost estimates for which you want to transfer the results to the material master.
Enter at least a plant or company code.
Enter a costing variant, costing date (valid from) and costing version.
You can further restrict your selection by entering the required material numbers.
If you do not enter a material number then all cost estimates are selected which meet your selection criteria (plant, company code, costing variant, date and version).
Specify which valuation view you want to update.
This step only applies if you cost multiple valuation views. For further information, see Group Costing .
Specify the material master field to which you want to transfer the costing results.
Tax-based price 1 to 3, commercial price 1 to 3
Planned price 1, 2, or
3
If you want to update planned prices 1, 2, or 3, specify the following:
The date from which the planned price is to be valid in the
Validity date
field
Which
cost component view
is to be transferred in the
Cost Component View
field
If you want to update the prices of the material components, set the
Material component prices
indicator.
If you do not set this indicator, the results of the cost estimates for material components are not transferred even if you selected these using the material numbers.
If you want to update the prices without a test run first, reset the
Test run
indicator.
If you want the system to display an overview of all the updated materials, set the indicator
With list
.
If you want to use
parallel processing
, set the indicator
Parallel processing
.
If you want to update other prices in the
background
, set the indicator
Background processing
.
Choose
to update the prices.
You see a list of the materials with the updated prices. If you have executed the function in the test run you receive a list of the cost estimates that would have been updated.
You can adapt this list to meet your requirements. For more information, see Functions of the ABAP List Viewer .
You can go from this list to the following:
To the costing view in the material master of each material, by clicking on the material number. By choosing
, you go back to the previous screen.
To the message log, by choosing
in this list.
You can also adapt this log to your requirements. For more information, see Editing and Printing the Log .
If you choose
in the log, you go back to the list of materials processed. By choosing
in the menu, you go back to the
Price Update
screen.
By choosing
Log
in the
Price Update
screen, you can redisplay the log that was most recently generated or processed.
See also:
For more information about inventory, see
Inventory
under
MM Material Valuation
.
MM Material Valuation
under
Material Valuation
and
Valuation Structures
for more information about valuating materials.