Changing the Cost Estimate Without Quantity StructureChoose
The screen
Change Material Cost Estimate Without Quantity Structure
appears.
Enter the material and plant.
In the
Costing data
tab page, enter the selection criteria for the cost estimate to be changed (
Costing variant
,
Costing version
,
Valid on
).
Choose
Cost ests
to search for the material cost estimate without quantity structure. The dialog box
Selection of material cost estimates - w/o qty struct
appears. Enter the selection criteria and choose
. The system displays a list of the cost estimates found. You can transfer the desired cost estimate from the list by double-clicking on it.
Choose
.
The list screen of the unit cost estimate appears.
Edit the costing items.
You can also use the detail screen for this. Place the cursor on the desired costing item, and choose
.
Choose
and check the header information.
Choose
to save the costing items.
When you save, the overhead is calculated. The costing items are saved temporarily. You return to the screen
Change Material Cost Estimate Without Quantity Structure
.
Choose
to save the material cost estimate without quantity structure.