Changing the Cost Estimate Without Quantity Structure

  1. Choose Start of the navigation path Accounting Next navigation step Controlling Next navigation step Product Cost Controlling Next navigation step Product Cost Planning Next navigation step Material Costing Next navigation step Cost Estimate Without Quantity Structure Next navigation step Change. End of the navigation path

  2. The screen Change Material Cost Estimate Without Quantity Structure appears.

  3. Enter the material and plant.

  4. In the Costing data tab page, enter the selection criteria for the cost estimate to be changed ( Costing variant , Costing version , Valid on ).

  5. Choose Cost ests to search for the material cost estimate without quantity structure. The dialog box Selection of material cost estimates - w/o qty struct appears. Enter the selection criteria and choose . The system displays a list of the cost estimates found. You can transfer the desired cost estimate from the list by double-clicking on it.

  6. Choose .

  7. The list screen of the unit cost estimate appears.

  8. Edit the costing items.

  9. You can also use the detail screen for this. Place the cursor on the desired costing item, and choose .

  10. Choose and check the header information.

  11. Choose to save the costing items.

  12. When you save, the overhead is calculated. The costing items are saved temporarily. You return to the screen Change Material Cost Estimate Without Quantity Structure .

  13. Choose to save the material cost estimate without quantity structure.