Retention Periods of QM Master Data (QM-PT) The following versions for a master record exist with status 3
(No longer used)
:
Note
The valid-to date in version 1 is calculated as follows:
Valid-to date (version 1) = valid-from date (version 2) - 1 day.
Only versions of a master record with status
4 (Marked for deletion)
are changed, whose
successor versions
have a valid-from date (in the above example 7/1/98) that lies
before
the start of the retention period.
Example
The start of the retention period is defined as
9/1/1998.
In this example, only the status of version 1 is changed to status
4.