Ungrouped Itemization

Use

In the ungrouped itemization you can:

Features

You can call the ungrouped itemization for any node in the costing structure.

You can display the ungrouped itemization in the item view.

If you choose Adjust quantities, you can multiply quantities of individual costing items by a factor. The change is adopted immediately and the quantity is recalculated.

Caution Caution

You can use this function only if you are simply displaying one costing node in the item view.

End of the caution.

You can use Exploding Base Planning Objects to replace items that link to a base object costing by their costing items.

Choose to display the log for the chosen costing mode.

You can make mass changes by choosing . You can make mass changes for more than one costing item across the entire bill of services.

Note Note

The Mass Change (Simulation) screen appears. You have specific functions at your disposal in the application toolbar . You can filter data, overwrite or enter values, and assign additions and deductions.

End of the note.

In the SAP standard delivery, there are different layouts available for the ungrouped itemization. You can adapt these layouts to suit your own needs by creating your own (see: Layouts ). You can create and delete subtotals for different sizes (see: Creating and Deleting Subtotals ).

Note Note

For more information about working with this type of list, see the SAP List Viewer .

End of the note.

Activities

  1. Choose a node in the costing structure.

  2. Choose Start of the navigation path Goto Next navigation step Ungrouped itemization on/off. End of the navigation path

    The display of the item view changes. You are now in the ungrouped itemization.

    All the costing items for the selected node in the costing structure are listed.

Example

Changing the price for a material

Using the external view of a BOS, the same material requirements can be distributed among different service lines. You can filter for this material for the procurement of material MAT1 and for the costing of budgeted costs. The transfer of the new price determined to the costing items affected takes place using the mass change function for the base price.

  1. You have called the ungrouped itemization for the entire BOS.

  2. Choose .

    The Mass Change/Simulation screen appears.

  3. Select the Material column.

  4. Choose .

    A dialog box appears.

  5. Filter for material MAT1 and choose .

    Only the costing items for this material are displayed.

  6. To select all the costing items, choose .

  7. Enter the new base price in the uppermost line in the Price column.

  8. Choose Overwrite column .

    A new price is entered for all the costing items for material MAT01 and the total value is calculated.

  9. Choose .