Parts Interchangeability in Plant Maintenance Orders The rules-based availability check with material exchange in SAP SCM can be performed on the consumption components for:
Standard plant maintenance orders
Refurbishment orders
Upgrade orders
Rules-based availability check with material exchange in SAP SCM is also possible for the main component for upgrade orders.
The results of the rules-based availability check are displayed in the SAP SCM system. Here, you can accept or modify the proposals which are then adopted in the component list of the respective order, which is updated, for example, with the new results of a material exchange or location substitution.
You can separately control the behavior of the rules-based availability check in SCM for the different types of plant maintenance orders listed above.
There is an enhanced advice code function for the components of a PM order. The advice code is entered in the material reservations during the submission of the results of the rules-based availability chec k if a material exchange for the components was executed. With the advice code you can prevent a further material exchange of the components.
Determination of installation locations (iPPE structure nodes)
You can use structure nodes to check the permissibility of a material component in a PM order or refurbishment order against a technical object list, for example, a master parts list (MPL).
The structure node is displayed on the
Component
tab page of the plant maintenance order. It is composed of three columns; s tructure code, class number and class type.
Depending on your interchangeability-specific Customizing settings, the structure node can be manually entered and/or the structure node can be checked or determined by the MPL. This is controlled by the following Customizing flags:
Configuration Control relevant
Controls if the structure node is checked or determined. This is only possible if it is a valid installation location for the material in the component record.
Manual Structure Node.
Controls if the structure node is editable.
For this check, interchangeability information maintained in SAP SCM can also be used for all materials active in APO .
The structure node can be set or replaced using BAdIAD_MPN_RBA_IC. You find this BAdI in Customizing under
The Customizing settings can be changed using BAdIAD_MPN_RBA_2_IC. You find this BAdI in Customizing under
To use therules-based availability check in SAP SCM for the consumption/main components of the different PM orders, you mustset the
IC Relevant
indicator and enter an ATP requirement profile in Customizing under
or
Refurbishment Order Consumption Components
or
Upgrade Orders
.
You must makeCustomizing settings for maintaining master parts lists for technical structures using iPPE and define checking groups under For more information see Determination of Installation Locations (iPPE Structure Nodes) .
Make Customizing settings to control which advice code is entered in the reservation for a PM order type, priority and availability check group of the material use advice code in Customizing under
To use this function you must have activatedthe business function
DefenseForces&PublicSecurity
(EA-DFP).
You must make settings for the rules-based availability check. For more information, seeSAP Library for
SAP Supply Chain Management (SAP SCM)
under
Only the manual availability check can be used. The overall material availability check and the automatic check are not supported.
Rules-based availability check with material exchange in SCM is not possible for the main component of refurbishment orders.
When you convert planned orders into refurbishment orders ( MD04 ), consumption components are not adopted in the refurbishment/upgrade order. The main component is adopted.
There are special rules for MRP relevancy of the refurbishment order (controlled by the flag AUDISP). These rules are not be supported by the upgrade order (upgrade component). In the upgrade order, RBA with material exchange using SCM is only possible for components that are MRP-relevant. The component of the upgrade order that should be upgraded (main component) is always MRP-relevant. The MRP relevancy of the consumption components is controlled by order type specific customizing (transaction OIOE ).