Example: Redistribution
This function calculates estimate values before the Reference Date for Redistribution (RDR) and redistributes them to the future periods after this date.
There are two possible methods: Snow Canon (SC) and Snow Plough (SP).
In the Snow Plough method the values are redistributed to the first value date field after the RDR.
In the Snow Canon method the values are redistributed proportionally to all the value date fields after the RDR. The following two examples show the differences between the two methods.
Input Data for Snow Canon
| Contract ID | Incurred Date | Reported Date | Due Date | Reference Date of Redistribution | Redistribution Method | Amount |
|---|---|---|---|---|---|---|
| A | 2017-01-01 | 2017-02-01 | 2017-03-01 | 2017-02-23 | SC | 200 |
| A | 2017-01-01 | 2017-02-01 | 2017-04-01 | 2017-02-23 | SC | 400 |
| A | 2017-01-01 | 2017-04-01 | 2017-05-01 | 2017-02-23 | SC | 300 |
| A | 2017-01-01 | 2017-04-01 | 2017-06-01 | 2017-02-23 | SC | 100 |
Flow Modeling Configuration
| Rule | Description | Rule Type | State | Rule Grouping | Rule Ordering | Selection |
|---|---|---|---|---|---|---|
| RED | Redistribution | Redistribution | Active |
| *Redistribution Method | *Reference Date of Redistribution | *Granularity Fields | *Date Determinant | Day of Month |
|---|---|---|---|---|
| Redistribution Method | Redistribution Reference Date | Incurred Date | Start Day of Period |
| *Value Date Field | *Value | Cleanup Fields |
|---|---|---|
| Reported Date | Amount | Due Date |
Key Configuration Description
| Field | Meaning | Notes |
|---|---|---|
| Redistribution Method | Indicates whether the redistribution method is “Snow Canon” or “Snow Plough”. | Mandatory input.
Values:
|
| Reference Date for Redistribution | Represents the threshold for the redistribution of the amounts. | Mandatory input |
| Granularity Field | Determines the size on one partition of data. | Mandatory input that has to be added to the Granularity section in the Signature tab. |
| Date Determinant | Specifies how the date should be determined. | Mandatory input
Possible values:
|
| Day of Month | Indicates the day of the month where Date Determinant is set equal to Day of Period. | |
| Value Adjustment Granularity Field | Determines the granularity fields necessary for the value adjustment. | Mandatory input that has to be added to the Granularity section on the Signature tab. |
| Period Type | Determines the periodicity of the date in the Value Date Field (monthly, quarterly, yearly). | |
| Value Date Field | Date that is compared to Reference Date for Redistribution. |
Mandatory input/output. Values in this field where the date is before the Reference Date for Redistribution will be redistributed (depending on the method). |
| Value | Amount for the redistribution | Mandatory input/output |
| Cleanup Field | This date is adjusted to perform the redistribution. |
Redistribution
Redistributed Records: The system selects the data with a Reported Date before the “Redistribution Reference Date”.
| Contract ID | Incurred Date | Reported Date | Due Date | Redistribution Reference Date | Redistribution Method | Amount |
|---|---|---|---|---|---|---|
| A | 2017-01-01 | 2017-02-01 | 2017-03-01 | 2017-02-23 | SC | 200 |
| A | 2017-01-01 | 2017-02-01 | 2017-04-01 | 2017-02-23 | SC | 400 |
Records to be Redistributed with Allocation Factors: The system calculates the allocation factors to redistribute the amounts.
| Contract ID | Incurred Date | Reported Date | Due Date | Redistribution Reference Date | Redistribution Method | Amount | |
|---|---|---|---|---|---|---|---|
| A | 2017-01-01 | 2017-04-01 | 2017-05-01 | 2017-02-23 | SC | 300 |
75% (= 300/400) |
| A | 2017-01-01 | 2017-04-01 | 2017-06-01 | 2017-02-23 | SC | 100 |
25% (=100/400) |
- 200 x 0.75 = 150
- 200 x 0.25 = 50
- 400 x 0.75 = 300
- 400 x 0.25 = 100
Exected Result for Snow Canon
| Contract ID | Incurred Date | Reported Date | Due Date | Reference Date of Redistribution | Redistribution Method | Amount |
|---|---|---|---|---|---|---|
| A | 2017-01-01 | 2017-04-01 | 2017-05-01 | 2017-02-23 | SC | 150 |
| A | 2017-01-01 | 2017-04-01 | 2017-05-01 | 2017-02-23 | SC | 300 |
| A | 2017-01-01 | 2017-04-01 | 2017-05-01 | 2017-02-23 | SC | 300 |
| A | 2017-01-01 | 2017-04-01 | 2017-06-01 | 2017-02-23 | SC | 50 |
| A | 2017-01-01 | 2017-04-01 | 2017-06-01 | 2017-02-23 | SC | 100 |
| A | 2017-01-01 | 2017-04-01 | 2017-06-01 | 2017-02-23 | SC | 100 |
Input Data for Snow Plough
| Contract ID | Incurred Date | Reported Date | Due Date | Reference Date of Redistribution | Redistribution Method | Amount |
|---|---|---|---|---|---|---|
| A | 2017-01-01 | 2017-02-01 | 2017-03-01 | 2017-02-23 | SP | 200 |
| A | 2017-01-01 | 2017-02-01 | 2017-04-01 | 2017-02-23 | SP | 400 |
| A | 2017-01-01 | 2017-04-01 | 2017-05-01 | 2017-02-23 | SP | 300 |
| A | 2017-01-01 | 2017-04-01 | 2017-06-01 | 2017-02-23 | SP | 100 |
| A | 2017-01-01 | 2017-05-01 | 2017-06-01 | 2017-02-23 | SP | 500 |
The flow modeling configuration is the same as in the previous example. The only difference is the value in the field Redistribution Method (“SP” stands for the Snow Plough method).
Expected Output for Snow Plough
| Contract ID | Incurred Date | Reported Date | Due Date | Reference Date of Redistribution | Redistribution Method | Amount |
|---|---|---|---|---|---|---|
| A | 2017-01-01 | 2017-04-01 | 2017-05-01 | 2017-02-23 | SP | 150 |
| A | 2017-01-01 | 2017-04-01 | 2017-05-01 | 2017-02-23 | SP | 300 |
| A | 2017-01-01 | 2017-04-01 | 2017-05-01 | 2017-02-23 | SP | 300 |
| A | 2017-01-01 | 2017-04-01 | 2017-06-01 | 2017-02-23 | SP | 50 |
| A | 2017-01-01 | 2017-05-01 | 2017-06-01 | 2017-02-23 | SP | 0 |
| A | 2017-01-01 | 2017-04-01 | 2017-06-01 | 2017-02-23 | SP | 100 |
| A | 2017-01-01 | 2017-05-01 | 2017-06-01 | 2017-02-23 | SP | 0 |
| A | 2017-01-01 | 2017-04-01 | 2017-06-01 | 2017-02-23 | SP | 100 |
| A | 2017-01-01 | 2017-05-01 | 2017-06-01 | 2017-02-23 | SP | 500 |