Example: Modulation In

The table below explains the general concept of Modulation In.

Scenarios Previous Contract Following Contract Rule
First scenario No Yes ModIn totals ModOut multiplied by –1 with Incurred Date = “Contract Start Date”
Second scenario No Yes ModIn totals ModOut multiplied by –1 with Incurred Date = “Contract Start Date”
      ModIn of following contract multiplied by –1 with Incurred Date = “Start Date of following Contract”
Third scenario Yes Yes ModIn should be calculated
      ModIn of following contract multiplied by –1 with Incurred Date = “Start Date of following Contract”

The following example shows how this configuration is calculated in practice.

Input Data

Contract Coverage Old Quota Share R. Quota Share R. Value Mod
CONTRACT_A COVERAGE_A 10 10 100
CONTRACT_A COVERAGE_B 10 20 100
CONTRACT_A COVERAGE_C 10 5 100
CONTRACT_B COVERAGE_A 10 10 100
CONTRACT_B COVERAGE_B 10 20 200
CONTRACT_B COVERAGE_C 0.1 1 1

Flow Modeling Configuration

Rules
Rule Description Rule Type State Rule Grouping Fields Rule Ordering Fields Selection
MDI Modulation In Modulation In Active      
Input Fields
Old Share Field Contract End Date
New Share Field Exposure Date
Granularity Field Contract Coverage
Changing Fields
Value Value Mod

Calculation logic: (New Share Field/Old Share Field)*(–Value)

Expected Output

Contract Coverage Old Quota Share R. Quota Share R. Value Mod
CONTRACT_A COVERAGE_A 10 10 –100
CONTRACT_A COVERAGE_B 10 20 –200
CONTRACT_A COVERAGE_C 10 5 –50
CONTRACT_B COVERAGE_A 10 10 –100
CONTRACT_B COVERAGE_B 10 20 –400
CONTRACT_B COVERAGE_C 0.1 1 –10