Uploading Requirements
You can upload requirements by using the /SALM/Requirement_Import report in transaction SE38.
Prerequisites
You have prepared an XLS file in one of the following ways:
-
If the process structure and requirements have already been defined in another SAP Solution Manager system:
You can upload requirements with Solution Documentation structure information (for example, process, process step, library) to the design branch of the on-premise SAP Solution Manager system with automated assignment to the process structure.
To download requirements from Solution Documentation, proceed as follows:
-
Create a scope for the process structures to be transferred:
-
When selecting the structure, select the Include Originals checkbox to transfer the library elements as well.
- When saving the scope, decide if it should be visible to all Solution Documentation users (public) or only to you (private).
-
Export the process structure (from Solution Documentation):
In the Solution Administration application, choose the Imports tab.
-
Choose the Global Functions icon and then Export.
-
In the popup, to establish the linkage to the library elements, select the Map deployment to origin checkbox.
-
Export the file to a share or your frontend.
-
Import the Solution Documentation process structure (JSON file) from the frontend or share to the target SAP Solution Manager system.
-
Export requirements from the Requirements Management application in your source SAP Solution Manager system to your frontend as an XLS file.
-
-
If the process structure and requirements have not been defined in another SAP Solution Manager system:
You can download an XLS file (without Solution Documentation structure information) and populate it with requirements from an external data source.
To prepare an XLS file:
-
To get the upload XLS structure, export the requirements list from your SAP Solution Manager system. There must be at least one example entry.
-
Populate the XLS file with data from a source XLS file or document.
-
Context
Procedure
Results
Next Steps
Maintain process structure/diagrams: Open each requirement. On the Documentation tab, assign process structure elements.