Copying Waves and Sprints to the Project Structure

Context

The project template defines the project structure with phases, waves, and sprints. You can adjust this structure by adding or deleting waves and sprints. Here, you learn how to copy existing waves or sprints to your project structure.

Procedure

  1. To open the project view of the project, choose the project on the landing page of Project Management - Focused Build Projects.
  2. In the project view, activate the edit mode by choosing the edit icon in the tool bar.
  3. Select a wave or sprint in the tree view.
  4. In the tool bar, choose the ( ) icon to copy a wave or sprint.
  5. In the dialog box, enter the parameters that are required.
  6. Choose Create.