Project Analysis

Use

You can enter status information for each Customizing project. Project analysis is based on status information. The more detailed status information you enter, the more project analysis options you have. You can analyze a single project, a project view or several projects simultaneously.

The project analysis and analysis results display options are very flexible. You can use selection criteria to restrict the scope of the analysis. You can also choose how the results of the analysis are presented.

SAP provides the following analyses:

  • Project information

    Analyzing activity data and all documentation types

  • Progress control

    For example, by linking status information (for example, project team members and a given status) or by aggregating the project information

  • Analysis scope for one or several Customizing projects

    Analysis is always based on the Customizing project.

  • General analyses

    Analyses for a specific day, for example

When you access project analysis, your standard project is the default. You can also define your own standard analyses and save them as variants.

You can also maintain status information and the project documentation directly from project analysis.

Accessing Project Analysis

To access project analysis:

  1. Choose Start of the navigation pathTools Next navigation step Accelerated SAP Next navigation step Customizing Next navigation step Perform ProjectEnd of the navigation path or Project Management.

  2. Choose Start of the navigation pathGoto Next navigation step Project AnalysisEnd of the navigation path in the Customizing screen, or the Project Analysis pushbutton.