Correcting Cumulative Delivered Quantities

Prerequisites

You correct cumulative quantities in scheduling agreements:

To do this, you create a correction delivery within the delivery schedule itself. This delivery is not relevant for requirements planning, shipping, goods issue, or billing.

Correct cumulative quantities only when the customer has not posted goods receipt.

Procedure

To create a correction delivery (document type LFKO ):

  1. Choose Corr. delivery on the delivery schedule tabstrip.

    The system displays a dialog box in which you enter a:

    Correction delivery date

    For help on deciding where you want to position the correction delivery, choose Display . The system lists delivery dates in chronological order.

    Correction quantity

    Enter a negative correction quantity by placing a minus sign after the quantity.

  2. Choose Enter and save the scheduling agreement.

Result

When you save the correction delivery, the system updates the cumulative quantities in the delivery schedule.

To display correction deliveries, choose Deliveries on the delivery schedule tabstrip, or Start of the navigation path Environment Next navigation step Display document flow End of the navigation path .

Example

Your customer returns 200 pieces of material from a delivery made on 7/10 because of damage during transport. Several other deliveries have been made before you prepare the correction delivery, so you view a list and choose an appropriate date. In this case you decide on 7/14 because it occurs after the delivery on 7/10 and before the delivery on 7/15.