Start or Repeat a Process or Process Step

Use

You start and repeat processes and process steps in the same way. The status indicates whether you need to perform a start or repeat.

You start or repeat a process step for the following reasons:

  • Breakpoint

A conditional or unconditional breakpoint precedes the process step.

  • Process termination

Process steps can be terminated because of a program error or technical error. You can display the reason for the termination in the job log .

  • Incorrect personnel numbers

Use the spool list and job log to check the process step. Remove the error and repeat the process step.

Note Note

If a process step or process is repeated, the following personnel numbers are processed again:

End of the note.
  • Personnel numbers without the status Successful

  • Personnel numbers with the status Not Selected

Caution Caution

You can only repeat processes, process steps, and personnel number sets that were successful if you change the status for the personnel numbers in question.

End of the caution.

Prerequisites

You have created a process .

Procedure

  1. Select the process or process step you want to start or repeat and choose Start of the navigation path Edit Next navigation step Process Next navigation step Start/Repeat End of the navigation path .

  2. Specify whether you want to start the process or process step immediately, or whether you would prefer to schedule it.

  3. If you start a process immediately, specify a variant on the selection screen of the selection program or enter the payroll area and payroll period and choose Execute .

Result

The process starts at the specified point in time and is processed in the background.

You can check the process flow using process control .