Intellectual Property Mass Changes
Use
If you need to make multiple changes to one or more Intellectual Properties (IPs), you can use the Mass Changes feature to carry out the required modifications, instead of making individual changes separately.
The mass change procedure is the sequence of steps that specifies the IPs to change and the types of changes to make.
To use this function, you must activate the business functionIntellectual Property Management (CRM_IPM_1).
Examples
Changing Attributes to a Group of Intellectual Properties
For multiple IPs that you select, you wish to change the content category from Drama to Thriller (you use the attribute content category to express the genre).
Terminate the Rights to Multiple Intellectual Properties
As a result of a library being sold, you need to terminate the rights to multiple Intellectual Properties
Change the Rights Dimensions Values of Selected Intellectual Properties
Individual rights dimension values Merchandising –> Men –> Footwear and Merchandising –> Women –> Footwear is consolidated into the new rights dimension value Merchandising –> Leather –> Footwear and you need to change all Intellectual Properties with the original rights dimension values.
Features
The Steps of a Mass Change Procedure
A step in a mass change procedure consists of:
-
An operation (Select, Add, Delete, Change)
-
The component of the IP on which the operation is to be carried out, referred to as the node.
The Different Types of Operations
There are four types of operations that can be carried out during the execution of a mass change procedure:
-
Select
-
Used to select IPs or IP nodes
-
Essentially a filter, where you use a search tool to specify the criteria of the IPs or IP nodes you wish to modify.
-
-
Add
-
Used to add new nodes to selected IPs
-
-
Delete
-
Used to delete nodes from selected IPs
-
-
Change
-
Used to modify attribute values of selected IP nodes
-
The Structure of a Mass Change Procedure
Mass change procedures are presented in tree format in the Procedure Overview assignment block:
-
The root node represents the header information of the mass change procedure (for example, the template information and the background execution settings)
-
The first sub-node is always a Select IPs step where you choose the IPs to change.
-
All other sub-nodes under the Select IPs step are the operational steps on the selected IPs.
For a visual representation of the node hierarchy for IPs, see Visual Representation of IP Nodes.
Required Customizing
To be able to execute mass changes, you need to ensure that you appropriately configure the following Customizing settings:
-
Define Mass Change Template Types
From SAP Customizing for Customer Relationship Management, select .
-
Define Number Range Intervals for Mass Change Logs
From SAP Customizing for Customer Relationship Management, select .
Required Authorizations
To be able to execute mass changes, you need to ensure that one of the roles associated with your user account is configured with the CRM_MASS authorization object, and that this authorization object is set up appropriately.
For more information, refer to the corresponding authorization documentation

