Master Agreement: Product Selection
Use
You can make a product selection at item level in the master agreement instead of selecting an individual product. The product selection corresponds to a partner product selection (partner/product range— PPR). You only decide on the specific product that you require when you create a provider contract. You can select a product that is admissible in the PPR. You can record a number of specific products here, record admissible product categories only, or the product hierarchy.
Prerequisites
If you want to use a PPR in the master agreement, you must ensure that the following prerequisites are met:
-
Only PPRs of the type 0040 – Provider Master Agreement are admissible.
-
The PPR must have the status Active.
-
The PPR must be valid for the master agreement partner. This means that they must have been maintained as a business partner in one of the PPR items or a PPR item that is valid for all business partners must be available.
-
The system does not check whether the PPR is valid during assignment in the master agreement. It first does this when the agreement is released.
Features
Special Features of Master Agreement Items with PPR
-
Select the technical item category usage ISX1 – Product Range, if you want item category determination to find a different item category to the one used for standard items in the standard product. This can be necessary if you for example want to use different text determination procedures for these items.
-
The Product List and Price Agreement assignment blocks are not displayed.
-
You can assign all sharing contracts. This means that the system does not check the product used against the sharing product.
Special Features During Release
-
If several items are released together, only one of them can contain a product selection.
-
All valid products for the PPR are displayed and you have to select one. The system also checks whether the PPR is valid. You can also only select products that belong to PPR items and are valid at the time of release.
-
If a product change is performed in the provider contract for an item, which refers to a master agreement item with PPR, the system performs a new check of the product against the PPR. A product change may no longer be possible since the PPR is no longer active or the product is not valid at this point in time.