Upgrade with Base Lease Extension

Use

You can use this function to upgrade a leased object if requested by the lessee or to exchange individual components of the leased object; at the same time you can extend the base lease. Because you change the term of the lease, you have to create a new payment schedule.

You make this change at item level, which means that it applies to individual contract items.

In SAP Customer Relationship Management (SAP CRM), you use the process RESC to execute a product upgrade. The change process UBLX (Upgrade with base lease extension) can be created and assigned in the Lease Accounting Engine (LAE, SAP ERP).

Prerequisites

  • You have a current lease with the status Released .

  • You have created upgrade products in the master data in combination with corresponding item category groups.

  • You have configured the Business Add-In BADI_CRM_FS_ACC_CHG_PROC_DET in such a way that the system finds the correct LAE process for the original financing and for the new financing.

Activities

If you want to execute an upgrade with base lease extension:

  1. Execute the process RESC with a base lease extension.

  2. Enter a new financing item with an assigned object item that contains the upgrade product. The system automatically creates the relationship between the product and the upgrade product in the contract.

  3. As soon as the system finds a relationship between the financing items for the product and the financing item for the upgrade product, it calls EC function modules via an event. You can use the event handler table CRMC_EVENT_CUST for customer entries.

  4. The system uses the financing product (master data) to set the initial change process for the new financing item for the upgrade product.

  5. The system calls the BAdI BADI_CRM_FS_ACC_CHG_PROC_DET for the financing item for which the process RESC was executed. The required LAE processes are assigned to this BAdI.