What's New Viewer - SAP S/4HANA

Quantity Structure Explosion for Costing Runs

In costing runs, quantity structure explosion is now part of the Selection step rather than a separate, optional step in the process flow. Explosion can be triggered with the Multilevel Quantity Structure Explosion option in the Selection step. You use this option if you want to ensure that the semifinished products and raw materials that are part of the value-added process are costed along with the materials selected for costing.

Technical Details

Product Feature is

Changed

Country Dependency

Valid for all countries

Used in Scope Item

BEG (Standard Cost Calculation)

Application Component

CO-PC-PCP

Availability

SAP S/4HANA 1809

Additional Details

You create costing runs with transaction CK40N or in the SAP Easy Access Menu under Start of the navigation pathAccounting Next navigation step Controlling Next navigation step Product Cost Controlling Next navigation step Product Cost Planning Next navigation step Material Costing Next navigation step Costing RunEnd of the navigation path.